Background of Job:
To install the motor, assemble & align the Water Maker Pump unit
The condition of the base on arrival SVL’s workshop
The base was prepared and machined
The channels were then welded in place
The steel plate surface was machined, cut & levelled
The plate & motor assembly were then put in position on the skid
Replaced:
- The 480 -120V transformer
- The High Pressure pump starter
- The Main Breaker
Removed:
- Starter for Low Pressure pump
- Low oil pressure protection circuit.